Julia Austin 107 Report post Posted June 13, 2011 The 80 m XHD TallTower installation procedure requires pull-testing anchors to 66.7 kN (15,000 lbf). The attached document provides some options for pull-testing anchors to the required load when heavy machinery is unavailable. 80m_Anchor_Pull_Test_Equipment.pdf Quote Share this post Link to post Share on other sites