Do you have an estimated timeline for when field testing and reengineering [sic] will be complete?

Recommended Posts

Q: Do you have an estimated timeline for when field testing and reengineering [sic] will be complete?


A: We can?t provide specific timelines. Our validation criteria require that we collect data from 50 pairs of anemometers for eight weeks. Only when we have sufficient data, and consensus that the sensors are performing up to pre-2006 standards, will we form conclusions and move ahead. There is a short amount of time on either side of those eight weeks to complete engineering activities, deploy sensors, and ramp up manufacturing.

Share this post


Link to post
Share on other sites

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
Sign in to follow this  

×
×
  • Create New...